The Quasi-judicial Functions of the Land Surveyor: Part I: Junior-Senior Rights

A 715Kb PDF of this article as it appeared in the magazinecomplete with mapsis available by clicking HERE

As surveyors, we often encounter discrepancies between record and measured values. Commonly we find excess or deficiency in the dimensions of a parcel that has been subsequently subdivided by deeds, thereby creating apparent gaps or overlaps between the newly created parcels. The adjoining property owners are usually not aware of the discrepancy until one of them has a survey.

The issue of an apparent overlap is one that most survey professionals including authors of standard survey textbooks deal with easily. Professional responsibility demands that the surveyor examine the chain of title, determine the order in which the deeds were executed and identify the junior/senior rights. He or she then allocates to the senior parcel(s) the full measure conveyed, with any excess or deficiency falling upon the junior parcel(s).

The issue of an apparent gap is one with which many (Including some textbook authors) are less comfortable. The issue should be analyzed in light of the rules that our courts have announced. Where there are conflicting title elements the law declares the order of importance:
1) Right of Possession
2) Senior Right
3) Written Intentions of the Parties to the Transaction

As an example, if Brown conveys the "W’ly 330.00 feet of Lot 7" to Green, later conveying the "E’ly 300.00 feet of Lot 7" to Grey, and the record shows that the east-west dimension of Lot 7 is 630.00 feet, it is obvious that Brown intended to convey all his interest in Lot 7 (see Figure 1). If Lot 7 subsequently measures 633.00 feet, the surveyor would locate the line between Green and Grey at 330.00 feet from the west line of Lot 7. Grey would own the E’ly 303.00 feet of Lot 7. In Adams v. Wilson, 137 Ala. 632 (1902) and Bloch v. Pfaff, 101 Mass. 535 (1869), the courts ruled "where the parts of lots are conveyed without reference to a plat or there is nothing in the deeds to indicate a purpose to divide the land in some definite proportion any excess in the quantity of the land must go to the last grantee and any deficiency must be borne by him." To hold that Brown still owned the three-foot "gap," you have to believe that he intended to keep the excess, which he did not know existed.

Two exceptions to the above stated principle may exist. First, in Writing Legal Descriptions Gurdon Wattles states, If Parcels A and B were sold simultaneously, or within a few months of each other, it has been held in some cases that the gap should be prorated between them, also on the theory that the common owner never meant to keep any of the lot from his sale but intended to divest his interest on the proportionate basis of the two deeds. In Ogdens Revised California Real Property Law Arthur Bowman states, Any surplus or deficiency is apportioned when it appears that the conveyances were intended to embrace the entire tract, as in the case of division by partition or by conveyances all executed at the same time. He adds, It is reasonable to presume that a grantor who divides and conveys a lot to two persons, by descriptions that would join if the lot were of the size shown by the records, did not intend to retain title to a narrow strip of surplus land shown by subsequent measurements to exist.

In essence, the courts are treating the parcels as having been created simultaneously, rather than sequentially. Blacks Law Dictionary defines simultaneous as a word of comparison meaning that two or more occurrences or happenings are identical in time. It also defines identical as Exactly the same time for all practical purposes. The problem that the surveyor faces is how much time has to elapse before the parcels are not considered as being conveyed simultaneously.

I disagree with Wattles that parcels conveyed within a few months of each other could be considered as being created simultaneously. But what is the cut-off? If possession has not taken place and the surveyor has a question about the interpretation of the deeds, it would be prudent to meet with the adjoiners and suggest a Boundary Line Agreement.

As with other matters in boundary determination, the surveyor must first gather all of the evidence. The question is, what was the true intention of the parties on the date of conveyance? If the grantor met with the subsequent grantees and they (collectively) agreed to the division (descriptions), proration would be reasonable since the agreement was simultaneous despite the fact that the deeds were sequential.

The second exception can occur when the gap is large and/or has a separate economic viability. As an example, Brown owns a tract of land with a record area of 800 acres. He conveys the west 450 acres to Green and the east 350 acres to Grey at a later date (see Figure 2). When the tract is surveyed, it is found to have 840 acres. As previously discussed, if the gap is small I would not hesitate saying it belonged to Grey. The question is, what is small? Forty additional acres added to an original 45 acres would not be small, but what if they are added to an original 350 acres (more than 10% difference)? I would be hard pressed to say that Grey would gain that much land (40 acres). I would contact Brown or Browns heirs and, if he or his heirs had no interest in the land, (unlikely), suggest that a portion be conveyed to Green and a portion to Grey in proportion to the original areas conveyed.

In summary, surveyors deal constantly with excess and deficiencies in measurements of parcels that have been sequentially subdivided. When these discrepancies are minor, the law requires that the senior deed receives its full deeded quantity (no more, no less) and that the remainder goes to the junior parcel or parcels. However, when the discrepancy is large or when the supposedly sequentially created parcels take on the elements of a simultaneous conveyance, other methods of distributing
the excess or deficiency must be looked at. Whenever title is confused or alternate locations are reasonable, the professional surveyor has a duty to attempt to assist the parties in reaching a mutually acceptable resolution.

Stay tuned for Part Two, in which I will discuss how to determine senior rights and how senior rights can change.

Author’s note: I would like to thank my mentor, Chuck Karayan, for reviewing this article.

Paul A. Cuomo is President and owner of both Pacific Land Seminars, Inc., and Paul Cuomo Press, Inc. Licensed in California since 1973, he was a surveyor for the CA Division of Highways from 1958-1980, and was employed as Deputy Surveyor of Orange County from 1980-1993. He currently serves as a boundary consultant, instructor, and expert witness, and has authored and co-authored numerous surveying publications.

About the Author

Paul A. Cuomo, LS

Paul began his surveying career in 1958 as an Engineering Aid for the California Division of Highways (Cal-Trans). He became a Licensed Land Surveyor in 1973 and, in that year, joined the staff at Rancho Santiago Community College in Santa Ana, California. He taught Boundary Control, Description Writing and U.S. Public Lands for over 25 years. Paul is also a guest lecturer at Cal- Poly Pomona .He left the Cal Trans in 1980 and took a position at the Orange County Surveyor’s Office as Deputy County Surveyor. He held that position until his retirement in January, 1993. Paul founded Pacific Land Seminars, an intellectual corporation, in 1985. He has given seminars on L.S. Exam test preparation, Boundary Control, Description Writing, the U.S.P.L.S.S., A.L.T.A. Surveys , Condominium Plans, the State Plane Coordinate System and Surveying Principles for the Civil Engineering exam. Paul served as State President of the California Land Surveyor’s Association in 1989. He is currently Chairman of the Southern California Section of A.C.S.M. and Chairman of the California Foundation for Land Surveying Education. In 1993 he co-authored the nationally acclaimed book “Advanced Land Descriptions” with the late Roy Minnick and Michael Pallamary Paul is also the author of :Surveying Principles for the Civil Engineer” ( P.P.I. ) On April 1, 2003 Paul acquired Landmark Enterprises from the late Roy Minnick. Re-named “Paul Cuomo Press, Inc.” it is the largest on-line book distributor in the U.S. and can be found at pcpressinc.com. Contact Author Article List Below